Nakanishi Production Facility
WINTERVILLE, GEORGIA
CLIENT
Nakanishi Manufacturing Corp.
ARCHITECT
Armentrout Matheny Thurmond
SIZE
16,000 sq. ft.
• Expansion to industrial production facility for new machine press that is anticipated to generate $5M annually
• Loading docks
• Load-bearing CMU, bar joists, and steel beams
• EPDM roof
• ACM panels and painted CMU
• Tight time line from site work to under roof (14 weeks) to account for press delivery, this includes 250 cubic yards press foundation pit